§ 17.17.120. Drawings to be approved.  


Latest version.
  • A.

    No zone change for a use, or a building permit for a structure or sign or exterior alteration, enlargement or major remodeling of an existing use, structure or sign that is subject to architectural review as prescribed in this chapter shall be issued until the drawings required by this chapter have been approved by the design review committee.

(Ord. 886 § 1 (part), 1987)